Installation handover, shipping and export purchasing

Check site access, power, air and line signals, and agree on deliverables and how to document service requests.

What to check before bringing equipment on site

Include aisles, door openings, lifts and the workcell floor in the same layout. Machine dimensions define the footprint. Package dimensions and gross weight define shipping needs. Allow room for operating, replenishment and servicing. Once site limits are known, record package size, access method and handover scope in the order's technical annex.

Specify power, air and signals in the technical annex

Specify site, voltage, frequency, phase count, grounding and connector requirements. Give existing compressed air or central vacuum conditions where applicable. List upstream in-position, machine busy, part complete and fault signals, with sender and wiring or protocol requirements. Use brochure configurations as a starting point and order documents for final wiring and interfaces.

Define the delivery scope

List destination, transport mode, unloading and handling responsibilities, desired delivery window, commissioning, training language and acceptance location. Itemize included services, shipment documents, spare-part identification and warranty period, start date and coverage. Purchasing, equipment and site teams can review the confirmation together.

Describe an after-sales issue

Record machine model, nameplate or serial number, part number, time, screen message and last normal action. For labeling, attach incoming and finished-part datum images. For tray loading, include affected pocket numbers and the empty-tray drawing. For spares, include markings, mounting location and photos. For maintenance, consult the supplied manual and the technical contact.

Site photos and layout drawings

On a top-view drawing, show upstream infeed, downstream outfeed, operator position and the available machine area. For labeling, add the belt centreline, handoff height and roll-change side. For tray loading, mark loose-part refill and empty/full-tray handling. Record site power, available space and existing interface requirements.

For photos without a drawing, add a direction arrow and a known dimension and attach the measured floor space. Use the selected configuration's engineering drawing for final installation dimensions and service clearances.

Sample trials and machine selection

Record the incoming material, the target position and the required hourly output.

Download selection resources