Workcell layout, machine footprints and line integration

See labeling and tray-loading workcells, download top-view DXFs and an A4 reference drawing for three labeling machines, and check site logistics and interfaces.

How do the two feeds meet at the labeling station?

The part arrives on the conveyor, and the label is peeled from the release liner. The choice of one or two cameras determines where and when each is imaged.

Labeling top view. Blue marks the product conveyor route. The dashed red line shows the held label travelling via the bottom camera to the application point.
Dual-camera workcell layout. Select the drawing to enlarge it.

Single-camera labeling

Once the part is in place and the head holds the label, the two feeds meet at the convergence point. The top camera images both together to calculate the relative position and guide application. Mark the target location and the edges or marks visible together.

Dual-camera labeling

After the belt stops, the top camera takes a fresh image to locate the part. The head moves to the bottom camera after pickup, waits for successful label recognition and then moves to the convergence point. With both results available, alignment and application proceed. For sample evaluation, inspect the part datum face and the label face visible after pickup.

How does a tray loader place loose parts in pockets?

From bulk feed to a full tray, check whether parts can be separated and their orientation identified. Then verify that the pickup face and the pocket allow placement in the specified pose.

Tray-loading workcell. The hopper supplies the flexible feeder, the top camera locates pickable parts, and the head loads them into specified pockets.
Functional relationship between the flexible vibratory feeder, vision pickup zone and tray. Confirm the site orientation and loading direction for each project.

Evaluate feeding with real loose parts

Include flipped, overlapping and sticking parts that can occur in production. Mark the correct pickup face, safe contact areas and fragile edges, and explain how to identify flipped parts.

Check placement using the actual tray

Provide tray outline, pocket dimensions, pitches, first-pocket datum and loading direction. Specify allowable part rotation, edge clearance and full-tray handoff direction. If orientation needs checking after pickup, specify the feature to inspect.

Add the labeling machine to the line layout

Footprints use brochure machine dimensions. Check available floor space using the top-view outlines, then confirm conveyor height, door swing, service access and utility entry with engineering.

Scaled top-view outlines of three labeling machines with length, width, height and a one-metre print check bar.

Print landscape A4 at actual size for a 1:25 scale. The 1,000 mm check bar should measure 40 mm on paper. CAD outlines are 1:1 with millimetre units and a lower-left origin. Use the configuration-specific installation drawing for anchors, wiring and cutouts.

ModelApprox. machine L × W × H (mm)Conveyor L × W (mm)CAD top-view outline
SPP-T130-11,300 × 1,350 × 1,7001,300 × 150Download DXF
SPP-T130-21,300 × 1,350 × 1,8001,300 × 200Download DXF
SPP-150-21,500 × 1,500 × 1,8001,500 × 450Download DXF

Tray-loader working area The B130 feeder measures 180 × 140 mm and its placement area is 250 × 200 mm. For B150-2, the corresponding figures are 305 × 226 mm and 350 × 250 mm. To determine the footprint, also specify tray exchange, infeed direction and operator side.

What should the site layout show for integration?

Mark the following on a floor plan and send it with the sample information.

Upstream and downstream handoff

Use arrows to show part flow and upstream discharge and downstream pickup points. Give conveyor heights and adjustment ranges. Allow room for roll replacement. For tray loading, mark the empty-tray infeed and full-tray removal sides.

Power, air and wiring

Mark site voltage, frequency, distribution and earthing points. For pneumatics or vacuum, provide pressure ranges and conditions at the point of use. Confirm connection details, air consumption and line lengths for the selected configuration.

Cycle timing and handoff signals

Define who sends ready, in-position and cycle-complete signals. Record sender, receiver, reset conditions and timeout handling, and agree on how upstream feeding pauses when a tray is full or parts are unavailable.

Sample testing and site handover

For labeling, inspect offset and appearance. For tray loading, check orientation, empty pockets and damage. Mark measurement datums on samples, agree on batches, timing and material changes, and keep approved sample photos and measurements for site comparison.

Sample trials and machine selection

Record the incoming material, the target position and the required hourly output.

Download selection resources