Sample validation for labeling and tray loading

Record measurement datums, orientation and affected pocket numbers, then use an agreed timing window to calculate accepted parts per hour.

How to validate labeling samples

Use parts from one batch and the same roll revision. Record drawing number, infeed direction, release liner and pickup face. Define datums and measurement points first. For a foam gasket, record the minimum opening clearance at each inner edge. Photograph finished parts in the same orientation and add an angled view if lifted corners affect acceptance. Apply the agreed tolerances and appearance criteria.

How to validate tray-loading samples

Specify the first pocket, target orientation and planned part count. Take a top-view photo of the empty and full tray. Record empty pockets, double loads, wrong orientation, incomplete seating and damage by pocket number. For failures in an outer row, review its fixture and process footage. For failures on one part number, check its infeed pose and pickup face.

Calculating effective hourly output

Define what counts as one part and when timing starts and stops. Record input count, accepted count, and any refills or tray changes. Effective hourly output is accepted parts × 3600 ÷ elapsed seconds. For example, 198 accepted parts in 600 seconds equals 1188 parts/h. Two labels per part means 396 successful applications during the trial. This example illustrates the calculation. See model specifications for reference rates.

What makes a trial report easy to verify?

Link each sample ID to measurements, photos and video timecodes. Keep the imaging method, part number, drawing revision and measurement tools. List verified conditions and conditions that produced deviations. Start a separate record after changing a roll, batch or head adjustment to trace the source of any differences.

Convert procurement targets into operations

Agree on what counts as one unit. A target of 1200 parts per hour, with two labels per part, requires 2400 applications per hour. At 40 parts per tray and 60 trays per hour, the target is 2400 placements per hour. These are examples of converting procurement requirements.

Record total trial time, accepted parts, applications per part and whether roll changes, refills and tray changes are included. Divide accepted parts by elapsed hours. Use the same timing basis when comparing models.

Published industry example

Asyril's example for miniature parts combines separation, vision positioning and tray loading. Consider the feeder goals and the final tray result separately when deciding what to record for your own parts. The project was carried out by Asyril and its customer.

Read Asyril's miniature-parts case study

Sample trials and machine selection

Record the incoming material, the target position and the required hourly output.

Download selection resources